Design & Construction of Road from Y Junction (Sungetsar–Jesmi Rock) to Cheema Karpola under EPC Mode

About This Project
HH Infra & Group is currently executing the Design and Construction of the strategic road connecting Y Junction (Sungetsar–Jesmi Rock) to Cheema Karpola under EPC mode for Project Vartak, Border Roads Organisation (BRO). Stretching approximately 18.59 kilometres through the challenging Himalayan terrain of Arunachal Pradesh, the project is aimed at strengthening strategic connectivity while improving transportation infrastructure in one of the country's most demanding geographical regions. The scope of work includes detailed engineering and design, extensive earthwork, hill cutting, rock excavation, slope stabilization, drainage systems, retaining structures, pavement construction and associated civil engineering works. Executing the project at high altitudes under harsh weather conditions and difficult site accessibility requires meticulous planning, specialized construction equipment and strict compliance with engineering, quality and safety standards. Upon completion, the road will significantly enhance defence logistics, improve year-round connectivity for local communities and support the long-term socio-economic development of the region. This prestigious EPC infrastructure project reflects HH Infra & Group's technical capability and commitment to delivering complex road construction projects under challenging terrain and operational conditions.
Project Information
Location
Tawang, Arunachal Pradesh
Department
Border Roads Organisation
Category
Road Infrastructure
Completion Year
2027
Status
In ProgressMore Projects




















